BoardWalks

  Erskin Falls
  Rosebud Boardwalk
  Frankston Boardwalk Stage 2
  Sweetwater Creek
  Sheoak Boardwalk
  Benalla Boardwalk
  Frankston Boardwalk Stage 1
  Gulls Way Staircase
  Cape Bridgewater Platform
  Point Addis Staircases
  Olivers Hill Staircase - Frankston
  Yanggai Barring Ringwood
  Lake Elizabeth General Works
  Seaford Boardwalk and Platform
  Red Rock Staircase and Platform
  Benalla Boardwalk Stage 2
  Anglesea Patform
  Rippleside Boardwalk
  Freeway Project - Donvale
  Drysdale Steps
  Aireys Inlet
  Triplet Falls
  Tim Neville Reserve
  Broken Falls - Grampians
  Breamlea Steps
  Eastlink
  Frankston Stage 3
  Bells Beach Steps
  The Dell - Clifton Springs
  Buckleys Stairs
  Casey Boardwalk and Bridge
  Lake Jubilee Fishing Platforms
  Clayton Retarding Basin



Benalla Boardwalk Stage 2
Boardwalk and Retaining Wall at Lake Benalla

boardwalk with mural behind 
boardwalk with mural behind
Client: Benalla Rural City

Date: 30 June 2003

Duration: 6 weeks

Cost: under $200,000.00

  boardwalk

  retaining wall

  After a hard days work

  Retaining wall before lake filled

Softwood piles and substructure. Deck and visible components of superstructure are spotted gum. Job includes extensive earthworks and drainage including beaching (rip rap) to areas of exposed bank. Along retaining wall a 200mm layer of FCR was placed and compacted to be asphalted at a later date. Job completed within budget and way ahead of schedule.