BoardWalks
Erskin Falls
Rosebud Boardwalk
Frankston Boardwalk Stage 2
Sweetwater Creek
Sheoak Boardwalk
Benalla Boardwalk
Frankston Boardwalk Stage 1
Gulls Way Staircase
Cape Bridgewater Platform
Point Addis Staircases
Olivers Hill Staircase - Frankston
Yanggai Barring Ringwood
Lake Elizabeth General Works
Seaford Boardwalk and Platform
Red Rock Staircase and Platform
Benalla Boardwalk Stage 2
Anglesea Patform
Rippleside Boardwalk
Freeway Project - Donvale
Drysdale Steps
Aireys Inlet
Triplet Falls
Tim Neville Reserve
Broken Falls - Grampians
Breamlea Steps
Eastlink
Frankston Stage 3
Bells Beach Steps
The Dell - Clifton Springs
Buckleys Stairs
Casey Boardwalk and Bridge
Lake Jubilee Fishing Platforms
Clayton Retarding Basin
Freeway Project - Donvale
Structures in wetlands
boardwalk over wetlands
Client:
FRH Projects
Date:
30 July 2004
Duration:
5 weeks
Cost:
under $150,000.00
Over large stormwater pit
Wetland boardwalks and pit enclosure on this Freeway project. Treated pine substructure and spotted gum deck and handrail system including stainless steel wire.