Open Space Infrastructure Australia   Timber Design & Construction
Home About Us Boardwalks Footbridges Buildings Other Projects Contact Us
 
Footbridges

  Altona Footbridge
  Ringwood Footbridge
  Yarunga Footbridge
  BJ Hubbard Reserve
  Coogoorah Footbridge
  Berwick Footbridge
  Mordialloc Footbridge
  Phantom Falls
  Deakin University Footbridge
  Narrawong Footbridge
  Sheoak Swingbridge
  Sale - Lake Guyatt Bridge
  Ironbark Creek Footbridge
  Mullum Mullum Swingbridge
  Cockatoo Bridge and Boardwalk
  Stephenson's Falls
  Yeddonba Cultural Walkway
  East Malvern Golf Course
  Buckleys Footbridge
  Balyang Footbridge
  Blue Water Lake Footbridge
  Marysville Bridges
  Warracknabeal Bridge
  Waurn Ponds
  Lake Eildon
  Hepburn Springs Bridge
  Water Guage Suspension Bridge
  Axe Creek, Bendigo



Altona Footbridge
Pedestrian bridge over Laverton Drainage Channel

Piles during construction 
Piles during construction
Client: Hobsons Bay Council

Date:

Duration: 8 Weeks

Cost: under $375,000.00

  Finished View

  View along deck from above

  Cast iron pilecap

Bridge is constructed from treated spotted gum. Piles are 300 dia , 8m long driven to basalt bedrock. Total length of bridge is over 120 m.
Timber Engineering Company Melbourne & Geelong Office Contact Details