Footbridges
Altona Footbridge
Ringwood Footbridge
Yarunga Footbridge
BJ Hubbard Reserve
Coogoorah Footbridge
Berwick Footbridge
Mordialloc Footbridge
Phantom Falls
Deakin University Footbridge
Narrawong Footbridge
Sheoak Swingbridge
Sale - Lake Guyatt Bridge
Ironbark Creek Footbridge
Mullum Mullum Swingbridge
Cockatoo Bridge and Boardwalk
Stephenson's Falls
Yeddonba Cultural Walkway
East Malvern Golf Course
Buckleys Footbridge
Balyang Footbridge
Blue Water Lake Footbridge
Marysville Bridges
Warracknabeal Bridge
Waurn Ponds
Lake Eildon
Hepburn Springs Bridge
Water Guage Suspension Bridge
Axe Creek, Bendigo
Altona Footbridge
Pedestrian bridge over Laverton Drainage Channel
Finished View
Client:
Hobsons Bay Council
Date:
Duration:
8 Weeks
Cost:
under $375,000.00
View along deck from above
Piles during construction
Cast iron pilecap
Bridge is constructed from treated spotted gum. Piles are 300 dia , 8m long driven to basalt bedrock. Total length of bridge is over 120 m.