Footbridges
Altona Footbridge
Ringwood Footbridge
Yarunga Footbridge
BJ Hubbard Reserve
Coogoorah Footbridge
Berwick Footbridge
Mordialloc Footbridge
Phantom Falls
Deakin University Footbridge
Narrawong Footbridge
Sheoak Swingbridge
Sale - Lake Guyatt Bridge
Ironbark Creek Footbridge
Mullum Mullum Swingbridge
Cockatoo Bridge and Boardwalk
Stephenson's Falls
Yeddonba Cultural Walkway
East Malvern Golf Course
Buckleys Footbridge
Balyang Footbridge
Blue Water Lake Footbridge
Marysville Bridges
Warracknabeal Bridge
Waurn Ponds
Lake Eildon
Hepburn Springs Bridge
Water Guage Suspension Bridge
Axe Creek, Bendigo
Hepburn Springs Bridge
Bridge to preserve heritage dredging arm
Crane place component of bridge into place
Client:
Parks Victoria
Date:
16 July 2009
Duration:
8 weeks
Cost:
under $150,000.00
Finished product
Dredging arm to be preserved
Steel bridge 21m span built around a dredging arm put down in 1930. The Hepburn residents fought and won a prolonged battle to preserve this part of their history.