Softwood piles and substructure. Deck and visible components of superstructure are spotted gum. Job includes extensive earthworks and drainage including beaching (rip rap) to areas of exposed bank. Along retaining wall a 200mm layer of FCR was placed and compacted to be asphalted at a later date. Job completed within budget and way ahead of schedule. |