BoardWalks
Erskin Falls
Rosebud Boardwalk
Frankston Boardwalk Stage 2
Sweetwater Creek
Sheoak Boardwalk
Benalla Boardwalk
Frankston Boardwalk Stage 1
Gulls Way Staircase
Cape Bridgewater Platform
Point Addis Staircases
Olivers Hill Staircase - Frankston
Yanggai Barring Ringwood
Lake Elizabeth General Works
Seaford Boardwalk and Platform
Red Rock Staircase and Platform
Benalla Boardwalk Stage 2
Anglesea Patform
Rippleside Boardwalk
Freeway Project - Donvale
Drysdale Steps
Aireys Inlet
Triplet Falls
Tim Neville Reserve
Broken Falls - Grampians
Breamlea Steps
Eastlink
Frankston Stage 3
Bells Beach Steps
The Dell - Clifton Springs
Buckleys Stairs
Casey Boardwalk and Bridge
Lake Jubilee Fishing Platforms
Clayton Retarding Basin
Point Addis Staircases
Construction of two separate staircases in difficult terrain
Second set of Steps to beach
Client:
N.R.E.
Date:
1 December 2001
Duration:
8 weeks
Cost:
under $80,000.00
Construction Underway in difficult coastal terrain
Construction nearing completion
Kane on the job
Second set of Steps
Located near Bells Beach outside of Torquay. Stairs are a total of over 70 metres in length, replaced existing dilapidated structures. Stairs lead to remote interesting beaches.