BoardWalks
Erskin Falls
Rosebud Boardwalk
Frankston Boardwalk Stage 2
Sweetwater Creek
Sheoak Boardwalk
Benalla Boardwalk
Frankston Boardwalk Stage 1
Gulls Way Staircase
Cape Bridgewater Platform
Point Addis Staircases
Olivers Hill Staircase - Frankston
Yanggai Barring Ringwood
Lake Elizabeth General Works
Seaford Boardwalk and Platform
Red Rock Staircase and Platform
Benalla Boardwalk Stage 2
Anglesea Patform
Rippleside Boardwalk
Freeway Project - Donvale
Drysdale Steps
Aireys Inlet
Triplet Falls
Tim Neville Reserve
Broken Falls - Grampians
Breamlea Steps
Eastlink
Frankston Stage 3
Bells Beach Steps
The Dell - Clifton Springs
Buckleys Stairs
Casey Boardwalk and Bridge
Lake Jubilee Fishing Platforms
Clayton Retarding Basin
Point Addis Staircases
Construction of two separate staircases in difficult terrain
Construction nearing completion
Client:
N.R.E.
Date:
1 December 2001
Duration:
8 weeks
Cost:
under $80,000.00
Construction Underway in difficult coastal terrain
Kane on the job
Second set of Steps to beach
Second set of Steps
Located near Bells Beach outside of Torquay. Stairs are a total of over 70 metres in length, replaced existing dilapidated structures. Stairs lead to remote interesting beaches.