Open Space Infrastructure Australia   Timber Design & Construction
Home About Us Boardwalks Footbridges Buildings Other Projects Contact Us
 
BoardWalks

  Erskin Falls
  Rosebud Boardwalk
  Frankston Boardwalk Stage 2
  Sweetwater Creek
  Sheoak Boardwalk
  Benalla Boardwalk
  Frankston Boardwalk Stage 1
  Gulls Way Staircase
  Cape Bridgewater Platform
  Point Addis Staircases
  Olivers Hill Staircase - Frankston
  Yanggai Barring Ringwood
  Lake Elizabeth General Works
  Seaford Boardwalk and Platform
  Red Rock Staircase and Platform
  Benalla Boardwalk Stage 2
  Anglesea Patform
  Rippleside Boardwalk
  Freeway Project - Donvale
  Drysdale Steps
  Aireys Inlet
  Triplet Falls
  Tim Neville Reserve
  Broken Falls - Grampians
  Breamlea Steps
  Eastlink
  Frankston Stage 3
  Bells Beach Steps
  The Dell - Clifton Springs
  Buckleys Stairs
  Casey Boardwalk and Bridge
  Lake Jubilee Fishing Platforms
  Clayton Retarding Basin



Lake Elizabeth General Works
Boardwalks etc along Lake walk

Various viewing platforms to Lake 
Various viewing platforms to Lake
Client: N.R.E.

Date: 30 June 2002

Duration: 2 weeks

Cost: under $50,000.00

  Timber decking over a causeway

  A very beautiful lake

  Boardwalk, steps and platform

  Dingo to carry gear

Lake Elizabeth was formed by a landslide in 1952. A subsequent landslide some time later spilled water to arrive at its present depth. The lake is now home to platypus and a variety of fish and bird life. It is a beautiful resource and a very rewarding walk and work place. Our work here involves boardwalks, viewing platforms and canoe moorings
Timber Engineering Company Melbourne & Geelong Office Contact Details